Weekend I-5 Closures April-May 2021 in Burbank-Glendale

1446
California I-5 Traffic | California I-5 Construction | I-5 Exit Guide

The California Department of Transportation reports that from April 30 – May 3, 2021, and from May 7 – 10, 2021, in Burbank, Glendale and Los Angeles:

  • Northbound I-5 will be reduced to only two lanes in Burbank between Alameda Avenue and Burbank Boulevard, and
  • Multiple ramps and freeway connectors will be closed (see list below) in Burbank, Glendale and Los Angeles on Northbound I-5 and Westbound State Route 134 (SR-134, the Ventura Freeway)
  • These closures will be from Friday, April 30, at 10 p.m. to Monday, May 3, at 6 a.m., and
  • From Friday, May 7, at 10 p.m. to Monday, May 10, at 6 a.m.
  • Ramp and connector closures may start before 10 p.m.
  • All dates, times and locations are subject to change due to weather or operational issues
  • I-5 lane and ramp closures will be only on Northbound I-5, none on Southbound I-5.

These closures will last for 55 hours, from Friday night to Monday morning.

These closures are required for crews to construct new concrete pavement on I-5 near Burbank Boulevard for the I-5 HOV (High Occupancy Vehicle, or carpool lanes) project.

The planned closures are as follows:

  • Northbound I-5 will be narrowed to two lanes between Alameda Avenue and Burbank Boulevard in Burbank.
  • The following ramps and connectors, listed from north to south, will be closed and detours will be posted:
    • I-5 Burbank Boulevard off-ramp
    • I-5 Orange Grove Avenue on-ramp
    • I-5 Westbound Alameda Avenue on-ramp
    • I-5 Eastbound Alameda Avenue on-ramp
    • I-5 Westbound Western Avenue on-ramp
    • I-5 Eastbound Western Avenue on-ramp
    • I-5 Zoo Drive off-ramp
    • Westbound SR-134 (Ventura Freeway) connector to Northbound I-5
    • Westbound SR-134 Fairmont Avenue on-ramp
    • Westbound SR-134 San Fernando Road on-ramp
    • Colorado Street Freeway Extension Edenhurst Avenue on-ramp

Before and during these two weekend operations, signs will be posted to inform motorists about the scheduled closures. Drivers on Westbound SR-134 will be advised to continue west and take Northbound State Route 170 (the Hollywood Freeway) to Northbound I-5, bypassing the construction zone.

Motorists in the Burbank area who plan to go northbound on I-5 should enter the freeway at the new I-5 Empire Avenue interchange, which is north of the construction zone.


On the road? Why not take us with you. All our websites are mobile-friendly. Visit our growing family of exit guides:  I-4 Exit GuideI-5 Exit GuideI-10 Exit GuideI-75 Exit Guide, and I-95 Exit Guide. Detailed exit service listings… discount lodging, camping, food, gas and more for every exit along the way!

Previous articleFunding Helps Six Lane Project on Interstate 5 in Shasta County near Completion
Next articleKamp Klamath RV Park – Klamath, CA
I-5 Exit Guide
One of the most complete road travel resources of its kind on the Internet! The Interstate 5 Exit Information Guide features exit service listings for the entire length of I-5 from Washington to California! Food, gas, lodging, rest areas, attractions and more…