Traffic Impacts for I-5 Rehabilitation Work in Washington

558
Washington I-5 Traffic | Washington I-5 Construction | I-5 Exit Guide

The Washington State Department of Transportation reports the following traffic impacts as a result of  the I-5 – I-205 to North Fork Lewis River Bridge – Rehabilitate Pavement Project:

  • Sunday, Aug. 14 to the morning of Monday, Aug. 15: Up to two lanes of southbound I-5 may close between the North Fork Lewis River Bridge and Northeast 139th Street, overnight, from 9 p.m. to 6 a.m., for pavement repair work.
  • Monday, Aug. 15 to the morning of Saturday, Aug. 20: Up to two lanes of southbound I-5 may be closed between the North Fork Lewis River Bridge and Northeast 139th Street, nightly, from 7 p.m. to 6 a.m., for pavement repair work.

NOTE: The speed limit is temporarily reduced to 60 miles per hour through the work zone.
NOTE: Drivers should watch for flaggers and anticipate delays through the work zone.


On the road? Why not take us with you. Our websites are mobile-friendly! Visit our growing family of exit guides:  I-4 Exit GuideI-5 Exit GuideI-10 Exit GuideI-75 Exit Guide, and I-95 Exit Guide. Detailed exit service listings… discount lodging, camping, food, gas and more for every exit along the way!

Previous articleBBQ, Live Music and Stand-Up Comedy All at the Long Beach BBQ Festival
Next articleTraffic Delays, Lane Closures on I-5 in Oregon
I-5 Exit Guide
One of the most complete road travel resources of its kind on the Internet! The Interstate 5 Exit Information Guide features exit service listings for the entire length of I-5 from Washington to California! Food, gas, lodging, rest areas, attractions and more…