The California Department of Transportation (Caltrans) District 2 and Golden State Bridge, Inc. are planning for work on sections of the Sacramento River Bridge on I-5 in Red Bluff, between Antelope Boulevard and Diamond Avenue, in the coming weeks.
Starting in early February, bridge joint replacement operations will begin. I-5 motorists should plan for nighttime lane closures on and around the bridge area Sunday nights through Friday mornings between the hours of 8:00 p.m. and 6:00 a.m. This work is planned for approximately one month.
I-5 Work Includes…
Concrete barrier (k-rail) will also be placed between the #2 lane and the shoulder of the bridge (both northbound and southbound) for the duration of this work. While no lane closures are planned during daytime hours, motorists should drive slowly and watch for personnel working behind the k-rail.
This work and the schedule are subject to change at any time due to weather, temperatures, or other factors.
The I-5 Exit Guide is the Internet’s largest and most complete website dedicated to Interstate 5 travelers. Find detailed exit service listings… lodging, camping, food, gas and more for every exit from Washington to California!
On the road? Why not take us with you. The I-5 Exit Guide is mobile-friendly and totally FREE. No App Required.
Traveling another route? Visit our growing family of exit guides:  I-4 Exit Guide, I-5 Exit Guide, I-10 Exit Guide, I-75 Exit Guide, I-80 Exit Guide and I-95 Exit Guide. Detailed exit service listings… discount lodging, camping, food, gas and more for every exit along the way!